Rapid Tooling & Injection Molding

Rapid tooling and injection molding for validation batches.

Injection molding services for validation batches of 50–2,000 parts — 7075-core aluminum molds cut in about 3 days, all-electric presses, insert molding, inspection report with every shipment.

100% inspected — inspection report with every part

One-stop prototype & low-volume build · Inspection report with every part · Quote in 24 h

Blueprint sectional line drawing of an aluminum injection mold with 7075 core, cavity and ejector pins — Arterki MFG

Between a 3D-printed prototype and a production tool sit the decisions that decide whether your program ships on time. Our rapid tooling cell closes that gap: L0 aluminum molds, CNC-cut with 7075 core inserts on standard CI-series mold bases, in about three days — then parts molded in-house on all-electric presses.

Built for validation batches

This is tooling for engineering validation and low-volume production: batches of 50 to 2,000 parts, so the parts in your qualification tests come from the same process your production parts will use. Insert molding runs in the same cell — overmolded inserts, threaded bosses and captured hardware.

Tooling feedback before aluminum is cut

Every tooling quotation carries DFM feedback from the molding engineers: draft angles, gate location, wall sections, ejector strategy and the resin callouts that drive the tool. And because the mold, the presses and the metrology live in one building, first articles are measured on KEYENCE IM and reported before the batch ships.

Tooling capability

Capability sheet. What a rapid tooling project includes.

Arterki MFGTooling capability
FeatureCapability
Tooling
Mold typeL0 aluminum rapid tooling, CNC-cut
Mold coresAL 7075 inserts
Mold basesCI-series standard mold bases
Mold lead time~3 days to cut — confirmed in quotation
Molding
PressesAll-electric — 5 t and 30 t
Batch size50–2,000 parts per validation batch
Insert moldingSupported in the same cell
Service
TolerancesPart-specific — set with DFM before cutting
Resin selectionConfirmed with your tooling quotation
InspectionKEYENCE IM · report in every shipment
FilesSTEP plus PDF drawings
  • Batch sizes beyond 2,000 are quoted per project.
  • Mold service life depends on part geometry and resin — set out in your DFM feedback.

Order flow

From CAD to molded batch. Five steps from part file to a validated batch in production material.

Arterki MFGTooling process flow
  1. Upload your part

    Send STEP files and PDF drawings with target quantity, resin preferences and critical callouts.

  2. DFM + tooling quote in 24 h

    Molding engineers return draft, gate and ejection feedback with a tooling quotation and a confirmed mold lead time.

  3. Mold cut in ~3 days

    7075 core inserts are CNC-cut and seated in CI-series standard mold bases.

  4. Molding + inspection

    First articles are measured on KEYENCE IM; the batch runs on all-electric presses with the report built as it runs.

  5. Delivery

    Validation parts ship with their inspection report in the box.

Equipment

Aluminum tooling, electric presses.

  • L0 Aluminum Molds

    CNC-cut in about 3 days, with 7075 core inserts seated on CI-series standard mold bases.

  • All-Electric Presses

    5 t and 30 t all-electric molding machines hold a stable, repeatable process window across the batch.

  • Insert Molding

    Overmolded inserts and captured hardware run in the same cell, inspected with the batch.

  • Validation Batches

    50–2,000 parts from the same process your production will use — proven before you commit a tool.

Tooling, by the numbers.

To cut an aluminum rapid tool
~3 days
Parts per validation batch
50–2,000
All-electric press sizes
5 & 30 t
Orders shipped with an inspection report
100%

Inspection

Every batch, measured.

Molded first articles are measured on KEYENCE IM vision metrology before the batch runs; full-field checks use the SHINING 3D FreeScan Combo+. The inspection report travels with the shipment, and tooling DFM sets the tolerances both the mold and the report are held to.

  • First articles measured before the batch runs
  • KEYENCE IM vision metrology
  • Tolerances set with DFM before cutting
  • Inspection report in every shipment
Request a quote
Arterki MFGFAI Report
Illustrative render: surface roughness tester stylus traversing a machined metal plate in cool lab lighting
Surface finish check · illustrative render

Materials

Resins, confirmed with your quote. Molding grades are fixed with your DFM feedback; the engineering plastics below are already in production on our floor.

  • Illustrative render: macro of a machined aluminum 7075-T6 block with facing marks and a chamfered edge, cool light

    Aluminum 7075

    Rapid tooling · mold cores

Also in production:ABSPOMPCPMMAPA6

Injection molding questions.

Tooling decisions are cheaper before the mold is cut — ask early.

How fast can I have molded parts?

An aluminum mold is cut in about 3 days; molding and inspection follow. Your quotation confirms the full lead time against your batch size.

What batch sizes make sense?

50 to 2,000 parts is the validation window where aluminum tooling pays off. Below that, print the parts; above it, we will talk honestly about a production tool.

Can you mold inserts in?

Yes — insert molding runs in the same cell on the same presses, with the inserts inspected as part of the batch.

Which resins can I choose?

Resin selection is confirmed with your tooling quotation based on the part's requirements, and molding grades are fixed with your DFM feedback before the mold is cut.

What about tolerances?

Molded tolerances are part-specific — they depend on resin, geometry and tool design. They are set with DFM feedback before cutting, so the tolerance on your drawing is the tolerance on your report.

Do you offer production tooling?

This service line is rapid tooling for validation and low volume. For larger programs we will tell you where the aluminum economics stop making sense.

100% inspected — inspection report with every part

Upload your parts for a tooling quote.

Molding engineers review your part and reply within 24 hours with a tooling quotation, DFM feedback and a confirmed mold lead time.

One-stop prototype & low-volume build · Inspection report with every part · Quote in 24 h